Visapur 33 kV overhead transmission

MKVDC · Visapur Lift Irrigation Scheme, Sangli district

Back to Portfolio

Scope of work

MKVDC awarded us the line and switchyard works to bring 33 kV supply from the Karve substation to both stages of the Visapur Lift Irrigation Scheme in Sangli district.

  • We completed 23.5 km of overhead transmission line across two sections, 14.5 km from Karve to Stage I and 9 km from Stage I to Stage II at Bhalekada.
  • We supplied and installed the line equipment, including ACSR conductor, disc and pin insulators, rolled steel joist poles and tower structures. The work also included pile and reinforced-concrete foundations and switchyard gantries.
  • We supplied and installed five transformers at Stage I and two at Stage II. The switchyard scope included the incoming feeder interface, control and relay panels, circuit breakers, instrument transformers, isolators and surge arresters.
  • We tested and commissioned the overhead line and both switchyards as part of the same power-supply scheme.