Our services

Power Line Work

Erection, shifting, strengthening and maintenance of overhead electrical lines for transmission and distribution applications.

All services

Delivery within the awarded scope

Planning, engineering, procurement, installation, testing and handover follow the applicable contract, approved drawings and client specifications. The systems included depend on the awarded package.

Operation and maintenance services are undertaken separately where awarded; EPC defect-liability obligations follow the project contract.

Project Experience

Dhangarwadi Lift Irrigation, Stage I

Maharashtra Krishna Valley Development Corporation (MKVDC) awarded us the 33 kV power-supply upgrade for Stage I of the Dhangarwadi Lift Irrigation Scheme at Helgaon, Karad.

  • We uprated the Atit–Venegaon transmission line from 100 mm² to 232 mm² ACSR conductor. We dismantled 150 existing poles and the associated overhead line and erected Panther and Dog ACSR conductor under the package.
  • We equipped the new Kalgaon feeder bay with an isolator, current and voltage transformers, an outdoor vacuum circuit breaker and a feeder control and relay panel.
  • We supplied and installed two 3.15 MVA power transformers at the Dhangarwadi Stage I receiving switchyard, with transformer and feeder protection and a DC battery and charger.
  • We used horizontal directional drilling to create a 220 m bore for the 33 kV cable at the railway crossing.
  • We commissioned the 33 kV line and switchyard works.

Karanjade 22 kV feeder relocation

City and Industrial Development Corporation of Maharashtra (CIDCO) awarded us the contract to relocate the Paragon, Gavan, Nere and Jawahar 22 kV feeders at Karanjade, Panvel.

  • Our scope included the NBT tower-line survey, layout and foundation drawings, factory and site test records, and as-built drawings.
  • We erected 72.3 tonnes of double-circuit tower steelwork and 44 rolled steel joist poles in 11 m and 13 m lengths.
  • We strung 25,284 m of ACSR Panther conductor along the relocated feeders.
  • We laid three-core, 300 mm² aluminium-conductor XLPE cable for the underground sections and fitted heat-shrink outdoor terminations.
  • We completed the feeder relocation with associated earthing, line insulators and 400 A gang-operated switches.

Visapur 33 kV overhead transmission

MKVDC awarded us the line and switchyard works to bring 33 kV supply from the Karve substation to both stages of the Visapur Lift Irrigation Scheme in Sangli district.

  • We completed 23.5 km of overhead transmission line across two sections, 14.5 km from Karve to Stage I and 9 km from Stage I to Stage II at Bhalekada.
  • We supplied and installed the line equipment, including ACSR conductor, disc and pin insulators, rolled steel joist poles and tower structures. The work also included pile and reinforced-concrete foundations and switchyard gantries.
  • We supplied and installed five transformers at Stage I and two at Stage II. The switchyard scope included the incoming feeder interface, control and relay panels, circuit breakers, instrument transformers, isolators and surge arresters.
  • We tested and commissioned the overhead line and both switchyards as part of the same power-supply scheme.

Barshi Stage I–Stage II 33 kV line

MKVDC awarded us the 33 kV single-circuit overhead connection between the two Barshi Lift Irrigation Scheme switchyards in Solapur district.

  • We completed 22 km of overhead line between the Stage I and Stage II switchyards.
  • We supplied and installed rolled steel joist poles up to 13 m, ACSR Raccoon conductor and disc insulators. The package also included three-core, 300 mm² cable for the 33 kV system.
  • Our line-erection scope covered pole and double-pole structures, tension fittings at cut points, pipe earthing, stays at deviations and clearances at crossings.
  • Our contract covered shop testing, site testing and commissioning, with provision for two years of operation and maintenance after commissioning.

Shirala 33 kV transmission line

MKVDC’s Ujjani Hydro Electric Division awarded us the 33 kV connection from Paranda substation to the Shirala Lift Irrigation Scheme switchyard.

  • We supplied and installed equipment for the 20.5 km single-circuit, pin-type overhead line between the two sites.
  • Our scope included metering provision and the design, manufacture, pre-dispatch testing and site testing of line equipment.
  • We managed transport and handling of line materials through storage and delivery to the erection sites. The contract included insurance until the distribution utility took over the line.
  • We completed the 33 kV line and handed it over to Maharashtra State Electricity Distribution Company Limited (MSEDCL).

Agalgaon–Jakhapur 33 kV line and switchyard

MKVDC awarded us the 33 kV single-circuit line and receiving switchyard for the Agalgaon–Jakhapur Lift Irrigation Scheme. The line runs from the Ranjani substation to the irrigation switchyard.

  • We completed the line package using 10 m and 12 m rolled steel joist poles.
  • We supplied and installed two 2 MVA oil-immersed outdoor transformers with on-load tap changers and separate transformer control and relay panels.
  • We supplied and installed the switchyard equipment, including vacuum circuit breakers, instrument transformers, isolators and surge arresters.
  • We supplied and installed three metering kiosks, an outdoor bus duct and a 110 V DC battery system with a dual float-and-boost charger.