Maharashtra Jeevan Pradhikaran awarded us the pumping machinery and automation package for the augmentation of the Nhava Sheva Stage III Water Supply Scheme.

  • Raw and treated water pumping machinery. Our scope covers design, supply and installation at the raw-water and treated-water pumping stations.
  • SCADA and automation. Our scope covers these systems for the water treatment plant and both pumping stations.
  • Testing, trial runs and commissioning. These form part of our contract scope.

Project photos

Select a photo to enlarge

Vertical pump motor and drive assembly
Project team with the vertical pumping units
Vertical pump assembly with intake strainer
Welding on a flanged pipe section
Motor feeder and protection panels
Outdoor transformer on its foundation
Vertical motor terminal connections
Pump coupling inside the drive frame
Inspection beside a vertical pump assembly
Vertical motor and lifting sling
Electrical yard and equipment enclosure
Positioning a transformer component by crane
Power cable terminations inside the switchgear
Pump bay and floor opening during site work
Checking the feeder panel controls
Site team at the pump house
Feeder panel meters and protection relays
Pump house interior and electrical equipment
Preparing the vertical motor for positioning
Work at the base of the vertical motor
Transformer foundation and cable route
Transformer lift viewed from the yard entrance
Crane and transformer inside the electrical yard
Moving the transformer into the electrical yard
Feeder panel checks in the pump house
Project team inside the pump house
Project team beside the pump drive units
Vertical motor and pump house team
Team beside the pump and pipework
Project team near the pump house panels
Site visit inside the pump house
Site ceremony at the electrical yard
Team gathering at the electrical yard
Site ceremony beside the vertical pumping unit
Welding Work during Shutdown
Welding Work during Shutdown
Pipe cutting and preparation work
Pipe section alignment and preparation
Pipeline cutting inside the service trench

Project videos

  • Nhava Sheva Stage III – Site Work