PCMC raw-water headworks at Nighoje–Talwade
We carried out the pumping and electrical package for Pimpri Chinchwad Municipal Corporation’s 100 MLD raw-water headworks on the Indrayani River.
- Five 456 HP vertical turbine pumps — We supplied and installed the pumps and tested and commissioned them at the new riverbank pump house. The specified duty was 1,700 m³/h per pump at a 50 m head.
- Two 2,000 kVA power transformers — We supplied and installed the 22/3.3 kV transformers for the pumping package.
- Nine 3.3 kV motor-feeder panel sets — We supplied and installed the panels that serve the pump motors.
- 15 m³ air vessel — We supplied and installed the vessel as part of the pumping system.
- SCADA and instrumentation — We integrated pump operation and operating instrumentation into the automated control system.