Project Experience

Nagpur Metro, RR Substation to Khapri

Nagpur Metro Rail Corporation · RR Substation to Khapri, Nagpur

Back to Portfolio

Scope of work

Nagpur Metro Rail Corporation awarded us the relocation of electrical utilities between the RR Substation and Khapri station on the North–South Corridor.

  • We shifted overhead HT and LT infrastructure and laid underground cable. Our scope covered joints, end terminations and protective pipes where required.
  • We laid 19.890 km of 11 kV XLPE cable and 4.353 km of LT armoured cable, a combined 24.243 km of cable items.
  • We connected mini feeder pillars, an oil-immersed 11/0.415 kV distribution transformer and motorised 11 kV ring main units with load-break switching and circuit-breaker configurations.
  • We erected overhead support structures and provided surge protection where the relocated infrastructure connected with the new circuits.