Project Experience

Nagpur Metro, Hingna Depot to Ambazari Lake

Nagpur Metro Rail Corporation · Hingna Depot to Ambazari Lake, Nagpur

Back to Portfolio

Scope of work

Nagpur Metro Rail Corporation awarded us the electrical utility shifting works for the East–West Corridor between Hingna Depot and Ambazari Lake.

  • We relocated overhead high- and low-voltage crossings and laid underground cable where existing electrical services intersected the metro works. Our scope included horizontal boring at road crossings, cable protection and end terminations.
  • We laid 12.555 km of 11 kV XLPE cable, 6.206 km of 33 kV XLPE cable and 7.800 km of LT armoured cable across three LT sizes, a combined 26.561 km of cable items.
  • We connected the new circuits to mini feeder pillars and motorised 11 kV ring main units.
  • We used reinforced-concrete and galvanised iron pipes to protect the cables where required.