We completed the chilled-water renovation for Bhabha Atomic Research Centre’s Mod Lab B at Trombay.
Temporary CPVC Headers — Our scope included temporary supply and return lines for the fan-coil units during the floor-by-floor changeover.
Permanent Chilled-Water Headers — We supplied and installed chilled-water pipework. Our scope included insulated galvanised steel pipework with aluminium cladding, supports, reducers and flanged connections.
Electrically Operated Isolation and Control Valves — Our scope included new isolation at floor take-offs and insulated composite connections to fan-coil units.
Hydrostatic Testing — Our acceptance scope included on-site hydrostatic testing of the pipework and valves before insulation.