Project Experience

22 kV and 33 kV cable conversion, Nerul

CIDCO · Sector 19, Nerul

Back to Portfolio

Work completed

Cable Networking Work

CIDCO awarded us the conversion of 33 kV overhead lines and relocation of existing 22 kV and 33 kV underground cables crossing development plots in Sector 19, Nerul.

  • We laid 13.5 km of 22 kV cable and 10.8 km of 33 kV cable, both three-core, 300 mm².
  • We connected eight 22 kV and five 33 kV four-way ring main units, each rated 630 A. Our 33 kV switching scope included motorised units with vacuum circuit breakers and compatibility with supervisory control.
  • We completed 2.6 km of horizontal directional drilling with a bore diameter of 200 mm.
  • We completed the physical works and commissioned the underground network.

Civil Work

We completed and commissioned CIDCO’s overhead-to-underground conversion and cable shifting works in Sector 19, Nerul.

  • 2.6 km of 200 mm Horizontal Directional Drilling — We completed the trenchless drilling for high-tension cable sections.
  • Bore and Carrier-Pipe Works — Our scope included steering the pilot bore, reaming and pulling the carrier pipe through.
  • 13.5 km of 22 kV cable and 10.8 km of 33 kV cable — We laid or shifted these cable lengths as part of the wider installation.
  • Thirteen Four-Way Ring Main Units — We supplied and installed eight 22 kV units and five 33 kV units as part of the conversion.

Project photos

Select a photo to enlarge

RMU cable termination works
Outdoor electrical-equipment installation and cable work
Metal-clad shelter installation
Cladding work beside the equipment shelter
Shelter enclosure and equipment access opening