Urmodi Lift Irrigation switchyards

MKVDC / WRD · Urmodi Lift Irrigation Scheme, Stages I and II

Back to Portfolio

Work completed

Internal & External Electrification

Maharashtra Krishna Valley Development Corporation awarded us the secondary bay and auxiliary transformer works at the Stage I and Stage II switchyards of the Urmodi Lift Irrigation Scheme.

  • We supplied and installed a 40 MVA transformer with natural ester insulating fluid and on-load tap changing. We equipped its bay with a 145 kV-class outdoor breaker, motorised isolators, current transformers and lightning arresters.
  • We supplied and installed 30 MVA and 12.5 MVA, 33/6.6 kV transformers in two separate bays.
  • We equipped the 6.6 kV systems with 40 kA vacuum circuit-breaker panels, rated at 4,000 A for the 30 MVA bay and 1,600 A for the 12.5 MVA bay.
  • We erected 132 kV and 33 kV gantries, laid power cables and integrated bay control units and IEC 61850 protection relays.
  • We completed the reinforced-concrete works and tested and commissioned the switchyard equipment.

Civil Work

We completed the civil works for the secondary bays and auxiliary transformer systems at Urmodi Lift Irrigation Scheme Stages 1 and 2.

  • 40 MVA, 30 MVA and 12.5 MVA transformer bays — We completed the concrete and reinforcement works for all three bays.
  • M10 and M30 Concrete — We carried out the concrete works. Our civil scope included excavation in hard murum, bedding, reinforced-concrete foundations, footings, columns and beams.
  • Fe 500 TMT Reinforcement — We placed bar reinforcement for the civil works. Our scope also covered formwork, concrete compaction and curing.
  • 132 kV and 33 kV Gantry Structures — We completed structures for the incoming, busbar and transformer bay connections.

Project photos

Select a photo to enlarge

Transformer and electrical-yard equipment overview
Switchyard and transformer-bay overview
Electrical-yard structures and ground preparation
Ground preparation beside the site building
Cable entry through a concrete chamber wall
Electrical equipment and cable-trench installation
Electrical-yard civil works and cable-route preparation