CIDCO awarded us the internal and external electrification and allied works for Targhar Railway Station on the Nerul–Uran corridor.
We completed 300 lighting and power wiring points and supplied and installed nine LT distribution panels inside the station, along with perforated and ladder cable trays, raceways, armoured cables and earthing.
We supplied and installed four 500 kVA transformers and three 160 kVA diesel generators. A microprocessor-based panel synchronised the generators.
We laid 17.7 km of 11 kV supply cable and supplied and installed a vacuum circuit-breaker panel and ring main units. A separate 750 m cable item covered conversion of an 11 kV overhead section to underground cable.
We supplied and installed LED lighting for the platforms, concourse and subways and LED and high-mast lighting in the forecourt and parking areas.
We completed the fire alarm, firefighting, public address and CCTV systems. The station access works included four machine-room-less passenger lifts and four outdoor heavy-duty escalators.
Project photos
Select a photo to enlarge
Station exterior and passenger canopiesHigh-mast lighting in the station forecourtNight lighting along the elevated approachEscalators at the station entranceCeremony beside the station switchgearGroup photo beside the station’s electrical panelsGroup photo at the station escalatorsCeremony beside the station switchgearOutdoor group photo at the Targhar site