Project Experience

Tivim and Tuem substations, Goa

Goa Electricity Department · Tivim and Tuem, Goa

Back to Portfolio

Work completed

Goa Electricity Department awarded us the tender to upgrade Tivim Substation and design and build a new 33/11 kV substation for the Electronic System Design and Manufacturing development at Tuem.

  • We supplied and installed a 63 MVA, 220/33 kV transformer at Tivim with remote on-load tap changing, online dissolved gas monitoring and nitrogen-injection fire protection.
  • We supplied and installed 220 kV and 33 kV outdoor switchgear at Tivim, including circuit breakers, motorised isolators, surge arresters and protection panels.
  • We supplied and installed two 20 MVA, 33/11 kV transformers at Tuem and connected them to indoor vacuum circuit-breaker switchboards on the 33 kV and 11 kV systems. The boards had incoming sections, bus couplers and outgoing feeders with IEC 61850 protection relays.
  • We laid two runs of 33 kV underground cable between Tivim and Tuem and supplied and installed two 100 kVA station transformers and eight 11 kV ring main units at Tuem.
  • We built the indoor substation building, equipment foundations and cable trenches, and completed testing and commissioning of the electrical package.

Project photos

Select a photo to enlarge

Transformer assembly work
Outdoor bay and cable terminations
Bay termination work - overview
Outdoor bay insulator work